Pervious Pour

       April, 2005

This pervious project was a 1.200 sq. feet driveway at 50 Walnut Ave, Atherton CA. The mix was a new design by John Barker, which was a slag mixture and gave a lighter appearance. The total yardage poured was 22 yards exactly. The pour went very well, it took two and a half hours to pour and place.

Contractor:
Carrera Construction
Steve Carrera
www.carreraconstruction.com

Central Concretes job supervisor:
Jeff Dulle